July 8, 2020 was a great day for road repair in Kaysville, Utah. That’s the day Green Construction Inc. was tasked with a utility cut that had previously been covered with plywood.
Shortly after securing the site, CGI’s dump truck bed tilted up, raining EZ Street asphalt into the hazard, while their crew leveled off the repair. Then it was time for a primary compaction—and a little more asphalt—before summoning the wheel roller to bring this utility cut repair to a timely close, making it a great day for Kaysville as well!